Bright white hallway with herringbone wood floors and a patterned tile inlay
EXTERIOR SERVICE
More house, built like the original..

When a leak finally gets caught, the damage doesn’t stop at the ceiling. We patch drywall, paint, refinish hardwood, replace insulation, and re-trim — all in-house, all in one contract. One call, one crew, one finished house.

EARLY WARNING
things to consider
01Warning 01

Recurrent Ceiling Staining

If water marks keep appearing after drying out, the underlying roofing, flashing, or plumbing leak has not been solved.

02Warning 02

Soft, Yielding Drywall or Trim

A severe sign that structural rot or active mold colony growth has completely eaten away the inner core of the wall.

03Warning 03

Sticking Doors & Wall Cracks

Diagonal cracks radiating from window or door headers usually signal foundation shifting rather than simple sheetrock settling.

04Warning 04

Bouncy or Sagging Subfloors

Indicates that the subfloor has separated from joists, suffered water degradation, or the joists themselves are overspanned.

PROCESS
How the job runs, start to finish.
Start
Step 01

Thunder PRO Site Audit

On-site physical inspection checking for structural settling, active moisture tracking, and color/texture logging.

Step 02

Itemized Repair Scope

Fully transparent, per-room written quote detailing material square footage, framing corrective needs, and trim details.

Step 03

Containment Setup

Full installation of zipped plastic dust doors, floor protection mats, and HEPA negative-air scrubbing deployment.

Step 04

The Demolition & Build

High-velocity work. Most residential wall patches and structural subfloor repairs are completed, mudded, and sanded in 1-3 crew days.

Step 05

Texture Match & Sign-Off

Final texture application, priming validation, complete containment tear-down, deep workspace cleanup, and warranty hand-off.

RECENT WORK
Selected Interior Repairs projects
View All →
Bright white hallway with herringbone wood floors and a patterned tile inlay
Project

Bright white hallway with herringbone wood floors and a patterned tile inlay

Jul 2026
View
Modern minimalist hallway with a grey door and white interior walls
Project

Modern minimalist hallway with a grey door and white interior walls

Jul 2026
View
Interior hallway with white walls and light wood herringbone flooring
Project

Interior hallway with white walls and light wood herringbone flooring

Jul 2026
View
Questions about Interior Repairs
How long does an addition take?

Design + permit: 2-4 months. Build: 2-5 months. Most families go start-to-finish in 6-9 months.

Get In Touch
Contact Us

LOCATION

Westport, CT – Serving All of Connecticut

HOURS

Mon-Fri 7am-6pm · Emergency: 24/7